We offer smart, reliable EV charging solutions built for every need. From installation to management, -seamless and efficient.
Adding chargers is rarely limited by space. It is limited by power. This guide explains how to estimate what your site needs, where load management helps, and when a grid upgrade is worth the cost.

Your current supply capacity, shown on your electricity bill or by your network operator, sets the starting point. Subtract your existing peak demand from that capacity to see how much headroom is available for chargers. Many sites have more spare capacity than they expect, especially outside office hours.
Count the vehicles that will charge at the same time, not the total number of parking bays. A 22 kW AC charger running flat out draws 22 kW, so 20 of them could demand 440 kW at peak. In practice, most vehicles arrive with partly full batteries and leave at different times, so real demand is far lower.
“Size for the vehicles you’ll have in five years, then let load management decide how the power is shared today.”
Evolta Engineering Team
Smart load management shares available power between chargers in real time, so you can install more units without upgrading your connection. It can also give priority to certain vehicles or time slots. Before you decide on a connection size, check:
Running larger cables and ducts during the first installation costs a fraction of digging up the car park later. We usually specify capacity for the next phase even if chargers are added in stages. A short survey can also flag the best location for any new transformer or switchgear.
If load management still can’t meet your needs, a grid upgrade may be required. Network operators can take several months to approve and complete works, so it pays to apply early. Our team prepares the application and compares the upgrade cost against the savings from a larger charger network.
Every site has a different power profile, but the method is the same: measure, model, then design with room to grow. Talk to an Evolta engineer before you commit to a connection size, and start your project with a plan that fits your budget.