Scalable charging solutions for workplaces, commercial spaces and electric fleets.
AC
Workplaces · hotels
DC fast
Retail · public sites
High-power
Hubs · fleet depots
Built for every commercial site
Workplaces
Commercial Properties
Public Charging
Fleet Operators
Workplaces
Commercial Properties
Public Charging
Fleet Operators
Charging Range
Up to
From overnight AC to high-power DC hubs, sized to how long vehicles stay.
Workplace Charging
One Partner
Up to
Consultation, site assessment, installation from a single team.
Certified installation teams
Our engineers check capacity, layout and grid needs, then return a costed design.
From a single car park to a nationwide fleet, we design charging around how your site is actually used.
01
Depot charging sized to your vehicles, shift patterns and grid capacity.
02
Depot charging sized to your vehicles, shift patterns and grid capacity.
03
Turn retail, hospitality and mixed-use car parks into a revenue-ready amenity.
04
Open-access hubs with fast turnover, clear pricing and network roaming.
Feasibility · Grid · Install · Support
Evolta began in 2014 as a two-person electrical contractor fitting the first workplace chargers in Bristol. Today we are a team of 60 engineers, planners and support specialists, delivering charging for businesses that can’t afford downtime.
Load studies, grid applications and phased roadmaps so you only build what you need today.
Open-standard hardware and software that adds bays without replacing what is already installed.
Monitoring, preventive maintenance and fast repair response once your site is live.
We plan, install and support charging infrastructure that grows with your site — from a handful of workplace chargers to high-power fleet depots.
/01
Wall or pedestal units for long-stay parking where vehicles sit for hours — the simplest way to electrify a workplace or hotel.
7.4–22 kW
Type 2
2–8 h dwell
Workplaces · hotels
/02
Compact rapid units that add meaningful range during a short stop, ideal for retail and public car parks.
50–180 kW
CCS2
20–60 min dwell
Retail · public sites
/03
Modular power cabinets with dispensers for charging hubs and heavy-duty fleets that cannot wait.
250–400 kW
CCS2 · MCS-ready
10–30 min dwell
Hubs · depots
How site type shapes the right charging mix. Project details shown are sample content.
Featured case study
Workplace Charging
Workplace and visitor charging for a 1,200-space business park, delivered in two phases.
Location
Bristol, UK
Charging type
24 × AC 22 kW · 4 × DC 60 kW
Scope
Design, grid upgrade, install, support
Facilities teams, fleet managers and property owners on life after switching on.

Operations Manager
“They sized the depot around our shift patterns, not a brochure. We went live on schedule and haven’t missed a departure since.”

Fleet Director
“The monitoring portal and 48-hour response SLA mean we rarely think about chargers anymore. That is exactly the point.”

Facilities Lead, Kingsway Hotels
“The load-balancing plan meant we avoided a costly grid upgrade and still had every van charged before the morning shift.”
Director, Reid & Co. Offices
Straight answers on timelines, site needs, equipment, maintenance and cost.
Yes. The on-site inspection, photo report and written quote are free with no obligation. We’d rather earn your trust with clear evidence than pressure.
Yes. We prepare and submit the application to your network operator and follow it through to approval.
It depends on your available power and parking layout. Our survey checks both, and load management lets more chargers share the same supply.
Choose AC if vehicles are parked for several hours, such as at workplaces and hotels. Choose DC if stops are under an hour, such as at retail sites and depots.
We monitor every unit remotely and usually spot faults within hours. An engineer attends on site if the problem can’t be fixed remotely.
Yes, after a free condition survey. We then quote a maintenance plan that suits the equipment.
Practical guides on charger choice, grid capacity and procurement for commercial sites.
“Evolta handled everything from the grid application to commissioning. Our drivers simply plug in, and the monthly usage reports make the business case obvious to our board.”